THE Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding on EDSA, with the proposed design released on Wednesday, Aug. 27.
The plan requires detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system, leading to the Makiling Creek.

As proposed, the project will be implemented in three phases, covering 182 hectares and involving a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6.
For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm per hour over 24 hours), exceeding the needed 36,945 cubic meters.
MMDA’s schematic shows that under normal weather, the water bypasses the pond and flows through the lagoon to EDSA.
During heavy rain, floodgates divert water flow into the pond; after rain, pumps discharge stored water slowly into EDSA toward the Makiling Creek.
The scope of works covers the impounding area, operations and powerhouse, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration., This news data comes from:http://ycyzqzxyh.com
Officials said operations and maintenance arrangements, and a memorandum of agreement, are still under discussion.
MMDA proposes rainwater facilities in Camp Aguinaldo to mitigate EDSA flooding
- Lacson lauds Leviste for arrest of DPWH engineer who offered P360M bribe
- Trump names US ambassador to India
- President asks governor to expose irregularities in govt projects
- Konektadong Pinoy Bill has lapsed into law — Palace
- Five journalists among 20 killed in Israeli strikes on Gaza hospital
- Private groups back DHSUD chief's anti-corruption policy
- Thailand acting PM moves to dissolve parliament — party
- A suicide bombing near a political rally in southwestern Pakistan kills 13 and wounds 30
- CFO office moves from Quezon City to Pasay
- DPWH chief rejects calls to resign as he vows to probe corruption in flood control projects